A really quick WIP post today since my family has been sick for about a week now and I'm still not 100%. Work continues on the Normandie terrain, specifically the other buildings. So far, I've finished building the stable and greenhouse (in the bottom pic) as outbuildings for the farmhouse and chateau (respectively).
I'm currently working on roof shingles for the petrol station (in the right background of each pic) and the schoolhouse (left background in the bottom pic). Besides the greenhouse (which was built using a clear acetate frame with basswood glued unto it), all of these were built using 3mm MDF cut using a table saw and dremel.
No comments:
Post a Comment